Z6Z_9522.JPG

  • 15  of  1459

Item Preview

JPG

Item Actions

  • Download
    Download options
Uploaded on:
2023-03-27 15:02:51.0
File Size:
8.07 MB
Extension:
JPG
Dimensions:
4024 x 6048 pixels
355 views 0 downloads

Details

Headline: 80th Street Bridge Deck Pour
Description: Pouring Concrete on the 80th Street bridge over I 94.
Keywords: Concrete Work,Bridge Construction,Bismarck District
Categories: Workforce/ General Workforce, Bridges/ Construction  
Size: 8.07 MB; 4024 x 6048 pixels; 341 x 512 mm (print at 300 DPI);
Date Created: Tue Aug 23 09:33:00 EST 2022